Create a Website Account - Manage notification subscriptions, save form progress and more.
The Highway Department is responsible for the maintenance and repair of all Town roads including pot holes, road settlements, drainage issues, storm water basins, and watercourse maintenance.
This process is used on roads which are in poor condition and consists of the complete removal of the bituminous concrete and lower grade base material not suitable for re-use. This process will include the following:
This process is used on roads which have a poor road surface but good base materials and will include the following:
This process is used on roads which have a good base material and marginal surface course and will include the following:
This process is used on roads which have developed surface cracks. Sealant is applied to the cracks to minimize water intrusion and frost heaves and extends the useful life of the road.