News Flash Home
The original item was published from 2/5/2025 2:33:00 PM to 2/5/2025 2:35:19 PM.

News Flash

Engineering Department

Posted on: February 3, 2025

[ARCHIVED] 2024 MS4 Annual Report - Notice

Picture1

In accordance with the requirements of the CT DEEP General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems, residents of the Town of Newington are hereby informed that a draft pdf of the 2024 MS4 Stormwater Annual Report. The report summarizes municipal stormwater compliance activities conducted within the Town of Newington during calendar year 2024, and will be posted on the town website on or before February 15, 2025 for a forty-five day public review and comment period prior to the draft being finalized and submitted electronically to the CT DEEP on or before April 01, 2025. 

Residents are hereby encouraged to review the report and submit written comments between February 15, 2025 and March 31, 2025. 

All comments should be addressed to Chris Zibbideo at 860-665-8570 or czibbideo@newingtonct.gov

Printed copies can be found in the Town Engineer’s office at 200 Garfield St. or online at  NPDES Phase II MS4 Stormwater Plan | Newington, CT.

Facebook Twitter Email

Other News in Engineering Department

Picture1

2025 MS4 Annual Report - Notice

Posted on: February 2, 2026
Picture11

Tree Replacement on Garfield St.

Posted on: January 14, 2026 | Last Modified on: January 14, 2026